摘要(英) |
This study is aimed at the Taiwanese agent company of American power equipment. In the near future, five pieces of generator equipment engineering project investigations were repeated, and repeated cases were collected and statistics, and high-level managers, middle-level managers, and grassroots managers were selected. A total of 18 operators conducted expert questionnaires. Since all levels of personnel are included in the interview, it is necessary to obtain complete cognition and interpretation for the repeated application of emergency generator equipment projects, and the results are more indicators and representative.
During the course of the study, it was learned that within the scope of the emergency generator equipment project, there were seventeen items for repeated work, and the expert questionnaire was used to put forward the "intensity of repeated application of the project" and "the effect level of repeated application". "Repeat work improvement measures - to explore the causes" and "Repeat work improvement measures - solutions", etc., based on the results of the questionnaire analysis, the settlement of the solution includes: "Implementation of the contract study and design review doubts ", complete the procedures for completing the review before the procurement", "complete the owner′s inspection immediately after the completion of the construction", "implement the education and construction management", etc., as long as the above four items can be mastered, the frequency of repeated operation of the emergency generator equipment project It has been greatly reduced, and this is an important contribution of this research. |
參考文獻 |
[1]Abdel-Aal, R. E. Short-term hourly load forecasting using abductive networks. IEEE Transactions on Power Systems, 19, (1), 164-173. (2004).
[2] Asber, D.; Lefebvre, S.; Asber, J.; Saad, M.; Desbiens, C. Non-parametric short-term load forecasting. International Journal of Electrical Power & Energy Systems, 29(8), 630-635. (2007).
[3]台灣電力公司企業網站
[4]Cai, J.; Ma, X.; Li, L.; Peng, H. Chaotic particle swarm optimization for economic dispatch considering the generator constraints. Energy Conversion Management, 48(2), 645-653. (2007).
[5] J. Bumby, S. Crossland and J. Carter “Electrically Assisted Turbochargers: Their Potential for Energy Recovery”, Proc. Hybrid Vehicle Conf., Inst. Eng. and Technology, Coventry, UK, pp. 47-52. , 2006.
[6]Gerke, “Diesel Engine Waste Heat Recovery Utilizing Electric Turbocompound Technol-ogy”, Proc. 7th Diesel Engine Emissions Reduction (DEER) Workshop, Portsmouth, USA, pp. 83-97. ,2001.
[7] Caterpillar Inc.企業網站
[8] Astour, H., Franz, V. BIM-and Simulation-Based Site Layout Planning. International Conference on Computing in Civil and Building Engineering, 291-298, (2014).
[9] Donyavi S., Flanagan R., The impact of effective material management on construction site performance for small and medium sized construction enterprises, A.R.J. (Ed) Procs 25th Annual ARCOM Conference, Nottingham, UK, Association of Researchers in Construction Management, (2009).
[10]溫宗修,發電機之混合式最大功率追蹤法,大同大學電機工程研究所碩士論文,2009。
[11]洪嘉駿,雙饋式感應發電機轉子側電力轉換器控制技術開發與實現,國立清華大學電機工程學系碩士論文,2008。
[12]陳曉晴,建築工程機電系統施工界面整合之探討,國立台灣大學土木工程學研究所碩士論文,2004。
[13]史瑞民,建築設計程序中整合機電設備設計衍生課題之研究 -以桃園集合住宅建案個案為例,國立臺灣科技大學建築系碩士論文,2014。
[14]徐志宏,廠房工程室內裝修與機電界面管理應用之研究,國立臺北科技大學土木與防災研究所碩士論文,2014。
[15]何世琛,集合住宅施工品質流程管理之研究,國立中央大學碩士論文,2003。
[16]吳翰彰,公共工程委辦監造作業品質執行現況與問題改善之研究,國立中央大學土木工程學系,碩士論文,2006。
[17]何宗欣,軍事工程委託監造執行現況缺失與問題改善對策之研究,國立中央大學土木工程學系碩士論文,2007。
[18]洪德蒼,高雄捷運BOT專案融資之風險認知與管理—Delphi和AHP法之運用,高雄第一科技大學金融營運研究所碩士論文,2000。
[19]Agarwal, A. K. and Das, L. M., “Biodiesel Development and Characterization for Use as a Fuel in Compression Ignition Engines,” Journal of Engineering for Gas Turbines and Power, Vol. 123, No. 2, pp. 440-447. , 2000.
[20]Campos-Fernandez, J., Arnal, J. M., Gomez, J. and Dorado, M. P., “A Comparison of Performance of Higher Alcohols/Diesel Fuel Blends in a Diesel Engine,” Applied Energy, Vol. 95, pp. 267-275. , 2012.
[21]Gyeong-Chan Lee, Tae-Uk Jung, “Cogging Torque Reduction Design of Dual Stator Radial Flux Permanent Magnet Generator for Small Wind Turbine”, Proceedings of the 2013 IEEE Tencon - Spring, Sydney, NSW, pp.85-89, 2013.
[22]Xi-Mei Li, Zong-Xiao Yang, Dong-Liang Song, “A novel outer rotor axial primary magnetic circuit permanent magnet generator”, Proceedings of the 2015 IEEE International Conference on Advanced Mechatronic Systems (ICAMechS), pp:20-23, Aug. 2015.
[23]Weizhong Fei, Patrick Chi and Kwong Luk, “Permanent-Magnet Flux-Switching Integrated Starter Generator With Different Rotor Configurations for Cogging Torque and Torque Ripple Mitigations,” IEEE Trans. on Industry Appications, pp. 1715-1722, 2011.
[24]Panwar NL, Shrirame HY, Rathore NS, Jindal S, Kurchania AK. Performance evaluation of a diesel engine fueled with methyl ester of castor seed oil. Applied Thermal Engineering 2010; 30(2):245-249. , 2010.
[25]Lee WJ, Liu YC, Mwangi FK, Chen WH, Lin SL, Fukushima Y, Liao CN, Wang LC. Assessment of energy performance and air pollutant emissions in a diesel engine generator fueled with water-containing ethanol-biodiesel-diesel blend of fuels. Energy 2011; 36(9): 5591-5599., 2011.
[26]Taehyung Kim, Hyung-woo Lee, Leila Parsa, Mehrdad Ehsani,“Optimal Power and Torque Control of a Brushless DC (BLDC) Motor/Generator Drive in Electric and Hybrid Electric Vehicles,”IEEE Industry Applications Conference, pp. 1276-1281, 2006.
[27]Yang, Y. H., Tsai, Y. T. and Wang, K. S., “The Characteristic of cumulative damage study about electrical insulation based on Accelerated life tests,” Journal of Mechanics. (On line published, Mar. 2013.
[28] Prasad S. Bhase,Gajanan M. Kolmare and A.S. Deshpande, “ Design & development of energy monitoring solution,” IEEE International Conference on Computing, Communication and Automation, pp. 1222-1227, April 2016.
[29]Makoto, M. The effects of the PDCA cycle and OJT on workplace learning, vol.24, 195-207. (2013).
[30]Sokovic, M. and Pavletic, D. Quality improvement - PDCA cycle vs. DMAIC and DFSS. Journal of Mechanical Engineering, 6, 369-378. (2007).
[31]行政院公共工程委員會,「工程施工查核小組查核品質缺失扣點紀錄表」,2016。 |