中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 42684423      Online Users : 1298
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Electronic Thesis & Dissertation [760/760]
    journal & Dissertation [77/77]
    retired tests [176/176]

    Collection Statistics

    Item counts issued in 3 years: 6(6.25%)
    Items With Fulltext: 96(100.00%)

    Download counts of the item
    Download times greater than 0: 96(100.00%)
    Download times greater than 100: 90(93.75%)
    Total Bitstream Download Counts: 38530(6.47%)

    Last Update: 2024-12-20 04:44


    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 1-10 of 96. (10 Page(s) Totally)
    1 2 3 4 5 6 7 8 9 10 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2024-09-27 延伸NSGA-II方法以求解具平行批次處理與物料分派之極小化Makespan與加權物料浪費雙目標之彈性零工式排程問題;An Extension of Nsga-Ii Approach for Flexible Job Shop with Parallel Batching and Material Assignment When Minimizing Makespan and Total Weighted Material-Wasted 沈國基
    2024-09-27 發展數據驅動AI賦能之預測性分析於異常診斷、設備維護及運營預測;Developing Data-Driven Ai-Enabled Predictive Analyses for Anomaly Diagnostic, Equipment Maintenance, and Operational Prediction 陳振明
    2023-07-17 以NSGA-II方法求解具批次與物料消耗限制之雙目標彈性零工式排程問題;Nsga-Ii Approach for Flexible Job Shop with Batching and Material Consumption When Minimizing the Number of Tardy Stage-Outs and Makespan 沈國基
    2023-07-17 發展數據驅動AI賦能之預測性分析於異常診斷、設備維護及運營預測;Developing Data-Driven Ai-Enabled Predictive Analyses for Anomaly Diagnostic, Equipment Maintenance, and Operational Prediction 陳振明
    2022-07-26 機械設備製造廠之加工位置佈置與排程控制問題的探討;A Study on the Processing Location Layout and Schedule Control Problems in a Machinery Equipment Manufacturer 何應欽
    2022-07-26 以極小化Makespan與Tardy stage-outs雙目標之零工式排程問題;A Bi-Objective Optimization for Job Shop Scheduling Problem Minimizing Both Makespan and Number of Tardy Stage-Outs 國立中央大學大氣科學學系
    2021-12-21 發展數據驅動之異常診斷與預測性維護策略—以塗佈機鍍膜製程為例;Developing a Data-Driven Anomaly Diagnostic and Predictive Maintenance Strategy for Coating Machines 陳振明
    2020-12-08 具機台合適度決定與時間窗口限制之平行批次處理問題;Parallel Batch Processing Problem with Machine Eligibility Determination and Time Window Constraint 沈國基
    2020-12-08 類Kiva揀貨系統之各種作業管理、決策與控制問題的探討(III);A Study on Various Operations Management, Decision-Making and Control Problems in a Kiva-Like Picking System (Iii) 何應欽
    2020-01-13 具縮減狀態空間機制的分支定界法;A Trimming-The-State-Space Mechanism Embedded Branch-And-Bound Approach 沈國基

    Showing items 1-10 of 96. (10 Page(s) Totally)
    1 2 3 4 5 6 7 8 9 10 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明