English  |  正體中文  |  简体中文  |  Items with full text/Total items : 78852/78852 (100%)
Visitors : 35602169      Online Users : 712
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/29528


    Title: Maintenance Outsourcing Contracts for New Technology Adoptions
    Authors: Tseng,FS;Tang,K;Moskowitz,H;Plante,R
    Contributors: 工業管理研究所
    Keywords: PLANNING HORIZON PROCEDURES;MACHINE REPLACEMENT MODELS;EQUIPMENT REPLACEMENT;INVESTMENT;SYSTEMS
    Date: 2009
    Issue Date: 2010-06-29 20:27:16 (UTC+8)
    Publisher: 中央大學
    Abstract: An external contractor receives a payment from a manufacturer for periodically performing preventive maintenance and for performing minimal repairs whenever process failures occur. Suppose a new technology will be available in the future, but the timing is uncertain. We propose specifying one or multiple time points in a maintenance contract, at which the manufacturer can adopt (switch to) the new technology, if it becomes available, and change the preventive maintenance schedule for the remaining time in the contract period. A model is developed to determine the value of using these (switch) points in a maintenance contract to the manufacturer. The numerical results show that, with a higher arrival rate of the new technology, the value becomes greater, and thus, the optimal switch point should be set earlier. Furthermore, if the new technology reduces maintenance costs, using switch points adds more value to a cost-plus-margin method than either the fixed payment or cost-plus-fixed-fee methods. On the other hand, if adopting the new technology results in higher maintenance costs, the value using switch points is higher for the fixed payment method.
    Relation: IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT
    Appears in Collections:[Graduate Institute of Industrial Management] journal & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML1033View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明