中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/3172
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 42718485      線上人數 : 1319
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/3172


    題名: 公共工程施工階段替代方案執行機制之研究;The research of public works construction stage Alternatives carries out of the mechanism
    作者: 王志欽;Chih-chin Wang
    貢獻者: 營建管理研究所碩士在職專班
    關鍵詞: 公共工程;政府採購法;替代方案;履約爭議;採購效益;Contract Dispute;Alternatives;Government Procurement Law;Public Works;Procurement Efficiency
    日期: 2009-06-05
    上傳時間: 2009-09-21 12:07:48 (UTC+8)
    出版者: 國立中央大學圖書館
    摘要: 政府採購法第35條規定「機關得於招標文件中規定,允許廠商在不降低原有功能條件下,得就技術、工法、材料或設備,提出可縮減工期、減省經費或提高效率之替代方案。」,其實施辦法並訂有獎勵措施,可鼓勵廠商投資研究或引進新技術、新工法,如有減省經費,並可獲得獎勵,是一項能增進採購效益並創造政府與民間廠商雙贏的策略。但自實施以來,因規定並非是「應」辦事項,而是「得」辦事項,且須於招標文件中有所規定才可實施,在無配套措施下,迄今尚無切合法令之實施案例。 本研究首先對於替代方案之國內外相關法令及案例深入探討,為深化替代方案制度之了解,進行相關議題研析,藉此分析其採購效益形態,並可避免衍生履約爭議;由相關案例探討以驗證本研究之論點,最後彙整各利害關係人(機關、廠商與設計顧問)實施替代方案之實務課題,並提出具體改善對策與配套措施,以為相關單位執行時之參考。期望藉此落實施工階段替代方案之執行,除增進政府採購效能,並達成提昇工程產業競爭力之目標。 Pursuant to Article 35 of Government Procurement Law (GPL), “Alternatives” is permissible if the contractor can demonstrate the fruition of reduction in schedule or budget, or of enhancement in efficiency or safety. The GPL also allows the sharing of benefits generated from the use of Alternatives. The weakness of the GPL, however, lies in the authorization of only agency discretion, rather than a stricter legal mandate. Most agencies still alienate themselves from this innovate concept and disregard the possibility of Alternatives, as much as their discretionary power, altogether. This work reviews current laws and regulations which are relevant to the promotion, or limitation, of Alternatives in government construction projects, discusses the benefits/risks of utilizing the Alternatives concept, and analyzes the likely strategy and procedures to which the Alternatives concept can be enhanced and facilitated among government agencies. This work also summarizes a handful of real-life cases, and examines the lessons learned in each case. The contribution of the work includes a range of strategic suggestions with respect to each interest party in a construction project, and a set of comprehensive recommendations for which the central government may take advice of. This work confirms that the Alternatives concept is very viable in public work projects, and, with proper streamlining of policies and administrative procedures, all government procurement agencies can reap the benefit of faster construction with lower budgets.
    顯示於類別:[營建管理研究所碩士在職專班] 博碩士論文

    文件中的檔案:

    檔案 大小格式瀏覽次數


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明