中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/50506
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 42678223      Online Users : 1308
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/50506


    Title: The formation and breaching of a short-lived landslide dam at Hsiaolin Village, Taiwan - Part II: Simulation of debris flow with landslide dam breach
    Authors: Li,MH;Sung,RT;Dong,JJ;Lee,CT;Chen,CC
    Contributors: 水文與海洋科學研究所
    Keywords: FAILURE
    Date: 2011
    Issue Date: 2012-03-27 17:34:02 (UTC+8)
    Publisher: 國立中央大學
    Abstract: Typhoon Morakot (2009) caused serious damage in southern Taiwan due to intensive rainfall with long duration. The issue of greatest concern arising from the disasters brought about by this extreme event was the burying of the entire village of Hsiaolin by a massive debris flow and landslide. Based on seismological and near-surface magnetic data, this tragic scenario arose due to a combination of events, a massive landslide, the formation of a landslide dam, and the consequent debris flow when this dam was breached. The objective of this part of the study is to investigate the spatial and temporal characteristics of the debris flow induced by the landslide breach. The US National Weather Service BREACH model and the Federal Emergency Management Agency approved FLO-2D model are integrated to facilitate the investigation of this catastrophe. A series of simulations including a 2D rainfall-runoff simulation over the Cishan River basin, landslide dam breach routing, and 2D debris flow simulation around the Hsiaolin Village were conducted. Hydraulic calculations were performed to determine the equivalent top elevation of the landslide dam based on inflows computed from the 2D rainfall-runoff simulation in association with the Digital Terrain Model (DIM) and upstream constraint of the backwater inundation areas. The hydrograph of the upstream inflow which induced overtopping failure was provided by a 2D rainfall-runoff simulation using the FLO-2D model calibrated by comparison with the downstream discharge record. The longevity of the landslide dam was less than 1 h, and it took only about 8 minutes to completely breach. The peak discharge rate of this massive landslide dam breach was 70,649 m(3)/s. The dam break hydrograph was then used for upstream inflow to drive the FLO-2D debris flow simulation. The average sediment concentration by volume was 0.362. The simulated deposited sediment depth showed a reasonable match to the differences of DTMs before and after the disaster. (C) 2011 Elsevier B.V. All rights reserved.
    Relation: ENGINEERING GEOLOGY
    Appears in Collections:[Graduate Institute of Hydrological and Oceanic Sciences] journal & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML755View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明