中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/658
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 42714406      Online Users : 1312
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/658


    Title: 以地理資訊系統輔助共同管道之最適設計
    Authors: 陳昌鉉;Chan-Xuan Chen
    Contributors: 土木工程研究所
    Keywords: 地理資訊系統;最佳化設計;ArcView
    Date: 2002-01-18
    Issue Date: 2009-09-18 17:09:42 (UTC+8)
    Publisher: 國立中央大學圖書館
    Abstract:   半世紀來,因人們的努力創造了所謂的台灣經濟奇蹟。隨著社會進步;各種需求也增加了,使得服務廣大民眾之自來水、下水道、電信、電力、瓦斯、石油等民生必需公用設施管線,亦須不斷改變以符合人們的需求,政府的各項公共建設,是推動經濟發展的基礎,然而要完全發揮公共建設的預期功效以及提高生活環境之品質,則有賴於後續有效的管理與維護。 現在各道路管線埋設已近飽和,故設置位置之選擇更行困難,管線單位資料不全,施工時缺乏相互間溝通聯繫,以致經常挖損其他單位管線衍生許多問題,有鑑於此自共同管道法頒布後,乃致力於研究如何有效地利用道路下之狹小空間,在現今之環境下解決共同管道設置路線及位置。 本研究藉由地理資訊系統與管線資料結合,利用地理資訊系統作為輔助工具進行電腦化及科學化之規畫分析,透過Arcview Analysis決定共同管道設置路線。考量管線設置成本、遷移成本、挖掘成本再以數學規劃方法與最佳化理論,藉由Lingo軟體求解最佳共同管道設置位置。使設計者節省甚多處理共同管道路線及位置問題希望能解決長久以來為人們所詬病之問題,使決策的過程科學化及透明化。 In the past half centry ,one created the miracle on Taiwan economics because of one’s hard work following this society improvement, every demand is in creasing. However , the puble cables settled for commodities such as tap water , a sewer , electric power ,and gas absolutly have to changed for satifying people’s need and every public development of Government , and this is a foundation of following out the economic development . For elaborating completely the expecting efficacy of the public constructions and promoting the quality of the enviroment , it depends on the following effective maintenance and preservation .Because of the full cable settled in every route , choosing the correct route for setting becomes more difficult.Without the complete information form other section , and communicating under construction , it happened o lof that one damaged other cable.After having common low , we are deveted to figure out how to use effectively in the narrow and small space under the road , and solve the setting problem on the common route and location in this modern times . By combiting the information system and the wire information of geography . we analyse the common route by it , and then decide the common route by ArcView Analysis . For considering the capitalized lost of setting , moving and digging , it is the best way to solve the setting of common route by lingo software . Therefore, this helps designer solve the problem in dealing for common route and location .We hope it can really handle the problem , and it lets the decision become scientific and tranpicuous.
    Appears in Collections:[Graduate Institute of Civil Engineering] Electronic Thesis & Dissertation

    Files in This Item:

    File SizeFormat


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明