English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 42692305      線上人數 : 1621
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/72482


    題名: 應用建築資訊模型與傳統估價於工程數量計算效能比較之研究;A comparative study on the effectiveness of building information model and traditional valuation in engineering quantity calculation
    作者: 呂尚儒;Lu,Shang-Ru
    貢獻者: 營建管理研究所在職專班
    關鍵詞: 建築資訊模型;工程估價;數量計算;Building Information Modeling;Engineering evaluation;Quantity calculation
    日期: 2016-07-07
    上傳時間: 2016-10-13 15:23:23 (UTC+8)
    出版者: 國立中央大學
    摘要: 本論文經由專家訪談及針對營造廠商、建築師事務所、工程顧問公司、建設公司、室內裝修等工程行業,實施問卷調查,調查內容為BIM技術與傳統估價數量計算及其效能差異性分析總有效樣本數為55份。
    本論文應用BIM與傳統估價執行工程數量估算上效能之實務性問卷調查,使用的研究工具為SPSS軟體來做統計分析,以加權平均值圖表做趨勢探討比較,應用BIM及傳統估算於工程估價上的不同工程種類(建築工程、工業廠房、土木工程、水利工程、軌道工程)及不同工程規模(1000萬以下、1000-5000萬、5000萬-2億、2億以上)其準確度、花費成本、花費時間、整體效益之差異性。
    研究結果得知,工程種類及工程規模會影響到BIM與傳統估價的使用性。傳統估價有其優勢,但卻無法取代BIM之優勢。由於工程需求不同,專業分工細緻,僅BIM軟體無法呈現出效益,需要其他專業軟體之結合搭配及協同作業,才能相得益彰。
    ;This paper through the expert interview and to create manufacturers, architects, construction companies, construction companies, interior decoration and other engineering industries, the implementation of the questionnaire survey. The survey content is BIM technology and the traditional valuation quantity calculation and the efficiency difference analysis total effective sample number is 55.
    In this paper, BIM and the traditional valuation of the performance of the implementation of the evaluation of the effectiveness of the practical survey, the use of research tools for SPSS software to do statistical analysis. On the trend of weighted average chart, Application of BIM and traditional estimation of different engineering types in engineering valuation(construction, industrial workshop, civil engineering, hydraulic engineering, track engineering) And the scale of different projects (ten million or less, ten million-fifty million, fifty million-two hundred million, more than two hundred million) The accuracy, cost, time, and the difference of the overall benefit.
    The research results show that the type of project and the scale of the project will affect the use of BIM and traditional valuation. Traditional valuation has its advantages, but it can not replace the advantages of BIM. Due to the different needs of the project, the professional division of labor is detailed, and only the BIM software can not show the benefit. The combination of other professional software and collaborative work, in order to complement each other.
    顯示於類別:[營建管理研究所碩士在職專班] 博碩士論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML482檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明