English |
正體中文
|
简体中文
|
Items with full text/Total items : 94459/94459 (100%)
Visitors : 87645181 Online Users : 486
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by
NTU Library IR team.
Scope
All of NCUIR
Engineering College
Executive Master of Civil Engineering
--Electronic Thesis & Dissertation
--retired tests
Tips:
please add "double quotation mark" for query phrases to get precise results
please goto advance search for comprehansive author search
Adv. Search
Home
‧
Login
‧
Upload
‧
Help
‧
About
‧
Administer
NCUIR
>
Engineering College
>
Executive Master of Civil Engineering
>
Browse By Title
Browse By Date
Browse By Authors
Loading...
Collection
Electronic Thesis & Dissertation
[
592
/592]
retired tests
[
70
/70]
Siblings
Graduate Institute of opto-Mechatronics
[
529
/529]
Executive Master of Opto-Mechatronics Engineering
[
2
/2]
Department of Chemical and Materials Engineering
[
1526
/1526]
National Central University Department of Chemical & Materials Engineering
[
2785
/2785]
International Environment Sustainable Development Program
[
96
/96]
Department of Civil Engineering
[
1551
/1551]
Graduate Institute of Civil Engineering
[
3439
/3439]
Interdisciplinary Program, College of Engineering
[
15
/15]
International Master Degree Program in Applied Materials Science(IAMS)
[
9
/9]
Institute of Materials Science and Engineering
[
1016
/1016]
Departmant of Mechanical Engineering
[
2302
/2302]
Graduate Institute of Mechanical Engineering
[
4375
/4375]
Graduate Institute of construction engineering
[
559
/559]
Graduate Institute of Environmental Engineering
[
1821
/1821]
Energy of Mechatronics
[
590
/590]
Executive Master of Mechanical Engineering
[
357
/357]
Executive Master of Construction Engineering and Management
[
186
/186]
Executive Master of Environmental Engineering
[
365
/365]
Community Statistics
Item counts issued in 3 years: 47(7.10%)
Items With Fulltext: 662(100.00%)
Download counts of the item
Download times greater than 0: 662(100.00%)
Download times greater than 100: 662(100.00%)
Total Bitstream Download Counts: 635507(1.09%)
Last Update: 2026-09-13 06:53
Top Upload
Loading...
Top Download
Loading...
Recent Submissions
桃園市道路挖掘會驗接管精進策略之探討;An Exploration o...
桃園市共同管道對智慧城市發展促進節能減碳效益之研究-以高鐵特定區共同管...
原住民族部落連絡道路-以「霞雲里佳志部落往119道路改善工程」為例;I...
以路燈輝度探討鋪面及標線可視性;Using street light ...
景觀工程因季節性人力需求分析預測之研究
瀝青混凝土挖(刨)除料添加水泥應用於道路基層成效評估-以秀朗橋車行地下...
轉爐石應用於瀝青混凝土鋪面成效研究- 以「桃園市中壢區人本示範道路龍慈...
公部門如何實踐綠建築以小檜溪派出所為例;Public Sector I...
台灣地動衰減式準確性分析;Study of the Predictab...
道路巡查導入PCI實際應用-以桃園市八德區為例;Practical A...
Jump to a point in the index:
(Choose year)
2026
2025
2024
2023
2022
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1985
1980
1975
1970
1960
1950
(Choose month)
January
February
March
April
May
June
July
August
September
October
November
December
Or type in a year:
Ordering With Most Recent First
Show Oldest First
Showing items 476-500 of 662. (27 Page(s) Totally)
<<
<
15
16
17
18
19
20
21
22
23
24
>
>>
View [
10
|
25
|
50
] records per page
Date
Title
Authors
2007-03-14
大漢溪上游河川魚類棲地適合度曲線之研究
李永安
;
Yung-An Li
2007-02-08
國軍老舊眷村改建工程現況困難問題處置效能之研究; A Study of Problem Handle Efficiency in present of the Aged Military Family Dependant Villages’ Reconstruction
王慕舜
;
Mu-Shun Wang
2007-01-16
中華電信會館訂價策略及經營改善模式之研究
蕭俊志
;
Jung-Jih Shiao
2007-01-12
瀝青混凝土路面施工品質管理-以雪山隧道為例; Asphalt Concrete Quality Management-example Syueshan Tunnel
林植峰
;
Chih-Feng Lin
2007-01-12
軍事工程委託專案管理執行缺失 與改善對策之研究 ;The Research On PCM's Execution Drawbacks And Improvements For The Military Construction
陸宗鑫
;
Zong-Sin Lu
2007-01-12
土木工程營建測試實驗室提昇檢驗機構之可行性評估; Feasibility Assessment of Promote Inspection Bodies for Civil Construction Engineering testing Laboratories
宋鴻禧
;
Hung-Hsi Sung
2007-01-12
軍事工程委託監造執行現況缺失與問題改善對策之研究; The Reserch on Current Outsourced Supervision’s Drawbacks and Improvements for The Military Construction
何宗欣
;
Zong-Sin He
2006-12-21
科技廠房修繕人力派遣最佳化決策模式之研究; Study of decision-making modes for the optimization of manpower assignment in science-tech based facility maintenance
楊宗仁
;
Tsung-Jen Yang
2006-11-03
公共工程委辦監造作業品質執行現況與問題改善之研究; The strategies of enhancing supervision for public works – specifically in construction stage
吳翰彰
;
Wu-han chang
2006-10-27
新建工程建造執照查核缺失要項之探討--以台北市為例
陳希楷
;
Hsi-Kai Chen
2006-07-13
建設公司興建住宅自辦工程採購管理機制之探討; The disscussion of the constructor's engineering procuration management
陳焜陽
;
Kun-Yang Chen
2006-07-13
AC-20瀝青混合料鋪面試驗路段之成效評估; The performance evaluation to the test road using AC-20 asphalt concrete mixture as the pavement
楊富程
;
Fu-Cheng Yang
2006-07-08
水庫營運效益評估之研究-以石門水庫為例; Reservoir Operational Performance at Financial Viewpoint: A Case Study of Shihmen Reservoir
李忠信
;
Li-Chung Hsin
2006-07-08
工程顧問公司專案管理組織績效與型態之研究; Configuration and Performance of Projectized Organization in Engineering Consulting Companies
林正杰
;
CHENG1-CHIEH LIN
2006-07-08
剛性鋪面部份深度維修現場施作之材料與工法研究; A Study of Materials and Techniques for Partial Depth Repair of Rigid Pavement
趙創慶
;
Chaung-Cing Chao
2006-07-07
河岸保護石籠工法之施工與破壞; Construction and Failure Behaviors of the Gabion on River Bank
廖根遠
;
Ken-yuan Liao
2006-07-07
以承包商觀點研析價值工程於鐵路地下化工程之個案研究; Contractor Viewpoint toward Value Engineering: A Case Study of Underground Railroad
黃維焄
;
Wei-Hsun Huang
2006-07-06
政府採購決標滿意度評估模型之初步研究; A Preliminary Study toward Mechanism of Contractor Selection for Public Sector
郭成堯
;
CHENG-YAO KUO
2006-07-06
預鑄專案成本估算策略之研究
楊坤霖
;
Gun-Shen Yang
2006-07-03
電廠知識管理社群評量探討與模擬之研究(以台電北部施工處為例); The power plant knowledge management society group comments the quantity discussion and the simulation research (Take the north construction of Taiwan Telegraphic Transmission as an example )
傅珍昌
;
Chen-Chang Fu
2006-07-03
廢輪胎橡膠瀝青混合料鋪面路段之成效試驗
姜紹平
;
Shao-Pin Chiang
2006-06-30
全套管基樁基礎初選模式之最佳化研究; All-casing Pile Foundation Model of Primary Optimization Study
黃志榮
;
Chin-Jung Huang
2006-06-30
促進民間參與污水下水道建設(BOT)對地方政府財政影響研究; A Financial Research of District Government on Promoting Private Participation using Build-Operate-Transfer to Construct Sewerage Sewer System
魏茂銹
;
Mao-Hsiu Wei
2006-06-30
高科技廠房在工期限制下最佳化排程之研究 -以中華映管無塵室工程為例 ;The research of the best procedures for Hi-tech factory on the limitation of construction time - With the exemplar of clean room construciton of Chunghwa Picture Tubes, Ltd.
戴勝鵬
;
Sheng-Peng Tai
2006-06-30
營建人機作業指派最佳決策模式之研究; The optiomal model of consstruction operator-machine work assignment.
呂理卿
;
Li-Ching Lu
Showing items 476-500 of 662. (27 Page(s) Totally)
<<
<
15
16
17
18
19
20
21
22
23
24
>
>>
View [
10
|
25
|
50
] records per page
::: Copyright National Central University. | 國立中央大學圖書館版權所有 |
收藏本站
|
設為首頁
| 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
DSpace Software
Copyright © 2002-2004
MIT
&
Hewlett-Packard
/
Enhanced by
NTU Library IR team
Copyright ©
-
隱私權政策聲明