中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/91724
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 80990/80990 (100%)
造访人次 : 42700921      在线人数 : 1462
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/91724


    题名: 整合專案交付契約之研究-以ConsensusDocs文件為中心
    作者: 廖凱民;Liao, Kai-Min
    贡献者: 土木工程學系
    关键词: 整合專案交付;IPD
    日期: 2023-03-24
    上传时间: 2024-09-19 14:11:44 (UTC+8)
    出版者: 國立中央大學
    摘要: 隨著時代的進步,以及數位化工具的普及,全球可謂在各個產業均經歷了翻天覆地的影響。過去常言道「營建業是促進經濟發展的火車頭產業,具有帶動上、下游相關產業之需求,進而刺激國家經濟成長之作用。」然而,雖然營建業是火車頭產業,台灣營建產值卻遠遠落後先進國家50%以上。工程專案從開始到結束,所牽涉之人、事、物可謂千絲萬端,多數見解對於業主與設計者及施工商之間的關係特別重視,多數的見解認為三者間的互動關係,將直接影響進度延宕的問題與超出業主預算的問題,同時也是一項專案的成敗主要關鍵點所在。整合專案交付(Integrated Project Delivery,IPD)的概念在根本的想法上迥異於傳統的營建承包模式,不以營建的生命週期作為發包的各個階段劃分,係以「專案」的整體當作觀察角度,統合人員、系統、業務架構、分潤模式、資源,促使所有的利害關係人可以及早參與專案,各取所需也共享資源與想法,達成減低浪費與創造利益最大化的可能性,同時並期待優化成果交付予業主,盡可能為專案加值,並且提升效率。
    本論文擬針對整合專案交付契約之內容予以探討,並針對其營運面、商業麵、組織面向予以討論,探討整合專案交付制度於我國施行之可能性及其障礙與推動策略。
    ;With the advancement of the times and the popularization of digital tools, the world has experienced earth-shaking influences in various industries. In the past, it was often said that "the construction industry is a leading industry that promotes economic development. It can drive the demand of upstream and downstream related industries and stimulate the country′s economic growth." However, Taiwan′s construction output value is far behind from that of the advanced country for more than 50%. From the beginning to the end of the engineering project, there are countless people, things involved, most of the views pay special attention to the relationship between the owner, the designer, and the constructor. It’s believed that the interaction between the three will directly affect the problem of delays in progress and the problem of exceeding the owner′s budget. It is also the key to the success or failure of a project. The concepts of integrated project delivery is far different from traditional contracting. Without dividing the life cycle of the project into different stages, IPD consider the project as a whole, integrating personnel, systems, business structures, profit sharing models, and resources to promote all the stakeholders to get involved in the project the sooner the better. The stakeholders may take what they need and share ideas hoping to achieve the possibility of reducing waste and maximizing benefits. At the same time, it is expected to deliver optimized results to the owner, add value to the project as much as possible, and improve efficiency of the project. This thesis intends to discuss the content of the integrated project delivery contract, and discusses its operational, commercial, and organizational aspects, also the possibility, obstacles, promotion strategies of implementing the integrated project delivery system in Taiwan.
    显示于类别:[土木工程研究所] 博碩士論文

    文件中的档案:

    档案 描述 大小格式浏览次数
    index.html0KbHTML27检视/开启


    在NCUIR中所有的数据项都受到原著作权保护.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明