English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 94459/94459 (100%)
造訪人次 : 87656867      線上人數 : 215
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: https://ir.lib.ncu.edu.tw/handle/987654321/99882


    題名: A multiple-attribute method for concurrently solving the pickup-dispatching problem and the load-selection problem of multiple-load AGVs
    作者: 何應欽;Ho, Ying-Chin;Liu, Hao-Cheng;Yih, Yuehwern
    貢獻者: 管理學院工業管理研究所
    關鍵詞: Applied sciences;Decision theory. Utility theory;Exact sciences and technology;Load selection;Logistics;Material handling, hoisting. Storage. Packaging;Multiple-attribute;Multiple-load AGVs;Operational research and scientific management;Operational research. Management science;Pickup dispatching;Queuing theory. Traffic theory;Transfert equipment, manipulators;industrial robots
    日期: 2012-07-01
    上傳時間: 2026-04-21 13:39:29 (UTC+8)
    出版者: Elsevier;Kidlington: Elsevier Ltd
    摘要: 摘要: The pickup dispatching and the load selection are two control problems in multiple-load AGVs. Although they affect each other and are affected by various attributes, many researchers have solved them as separate problems and adopted single-attribute methods for them. In this paper, we propose a multiple-attribute method that can solve them simultaneously. The proposed method has four stages: preparation, clustering, evaluation and execution. At the preparation stage, we calculate the weights for three attributes (i.e., slack time, waiting time and distance) that are important to our problems based on the system's current status. These weights will be useful at the second and third stages. At the clustering stage, parts needing vehicle service are clustered into part groups based on their similarity in these three attributes. At the evaluation stage, part groups are evaluated by considering these three attributes. The part group with the greatest evaluation value will be served by the AGV. At the execution stage, a procedure is proposed to assist the AGV in picking up parts efficiently. Simulations were conducted to test the performance of the proposed method in throughput, flow time, and tardiness. The results show that the proposed method outperforms not only single-attribute methods, but also methods that solve pickup dispatching and load selection separately.
    出版者: Kidlington: Elsevier Ltd
    出版日期: 2012-07-01
    出處: Journal of manufacturing systems, 2012-07, Vol.31 (3), p.288-300
    資源來源: UZH-/ZB-Zugriff: Elsevier ScienceDirect Journals
    版權: 2012 The Society of Manufacturing Engineers
    版權: 2015 INIST-CNRS
    識別號: ISSN: 0278-6125
    識別號: EISSN: 1878-6642
    識別號: DOI: 10.1016/j.jmsy.2012.03.002
    顯示於類別:[工業管理研究所 ] 期刊論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML30檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明